Model: 150*25B
The installation is convenient, simple and labor-saving, and the later adjustment is as convenient as disassembly; It is not afraid of rain immersion and insect and ant bites. It has various colors, green environmental protection, no odor, no formaldehyde, light and climate resistance; It can be bonded and painted, easy to process and take care of. It can remove dust in rainy days, and the color is brand new.
Intruduction
The software model is used for manufacturing bushes, pools, flower bins, entertainment included benches in inexperienced areas and squares, or even may be matched with different profiles to shape simple and heavy fences in keeping with the scene.
Spceification
Basic Description | ||
Name | Wood-plastic floor | |
Serial Number | APL—140*25 | |
Material | Wood,HDPE,Some other Additive | |
Component: | 60% Wood+ 30% HDPE+ 10% Additives | |
Specification | 140*25(mm) | |
Color | Teak,Light Grey,Coffee,Chocolate,Black | |
Certificate | CE,SGS,ISO | |
Classification | Hollow and Solid | |
Application: | Outdoor, | |
Customized: | Non-Customized | |
MOQ: | 200 Sq m for WPC Decking | |
Main Market: | Southeast Asia,Central Asia,Europe & North America | |
Lead Time: | 15 Days for 1X20 GP Container | |
Transport Package: | Pallet ,Stretch Film,fluting paper (for whole container) | |
Advantages | Wear-resisting | Water-proof |
Dam-proof | Fireproof | |
No-pollution | Environmental Friendly |
Project Display
Features
1. Eco-friendly made from recycled plastics and non-virgin wood.
2. Highly termite resistant.
3. Timber like finish for an excellent non-slip feel.
4. No staining or painting required.
5. Water and corrosion resistant, alkali-proof, moth-proof, stain-able and malleable, low pollution risk and odor-free.
6.Easy to install and clean.
7.Against UV.
Color matching / Accessory system
Surface Treatment
Installation steps
1. Lay keel on flat and hardened ground. | |
2. The gap between two keels shall be controlled between 300mm and 350mm. | |
3.The keel is fixed on the ground with 3 expansion screws per meter. | |
4.Install special fasteners for fixing the first floor. | |
5.Install the first floor. | |
6.Install the second floor and secure with screws. | |
7.Continue to install the remaining floors in this way. | |
8.Install floor edging and secure with screws. |
Submitted successfully
We will contact you as soon as possible